From first quote to switched on — the stages, the paperwork, and the realistic timeline.
Most residential solar projects take 1 to 3 months from signing to activation. The install day itself is usually just one or two days; the rest is design, permitting and utility approval.
Start with an estimate, then get matched with installers.
The physical install is usually 1-2 days. The full project, including permits and utility approval, typically runs 1-3 months.